Water Board 13267 Order

A Water Code section 13267 order requires technical or monitoring reports for a Water Board investigation. The order may require a business or property owner to provide historical records, prepare a sampling plan, conduct a site investigation, or investigate suspected contamination. The reporting requirement may apply even when the recipient disputes responsibility for the contamination. A section 13267 order is enforceable and should be treated as a formal regulatory requirement. Review the requested work, reporting obligations, and deadlines carefully. Do not assume that raising a dispute excuses compliance.

What the order may require

Start by identifying who is named in the order, why the Water Board is requesting information, and what the recipient must submit. Requirements may include a work plan, field investigation, monitoring program, and final technical report, each with separate deadlines. Review all attachments and incorporated documents, not just the cover letter.

A section 13267 investigation order does not, by itself, establish liability for contamination or necessarily require a particular cleanup remedy. The Water Board may, however, combine section 13267 reporting requirements with cleanup and abatement authority in the same order. Read the entire document to understand the statutory authority, required work, and available procedures for administrative review.

Review the agency’s basis and the requested scope

Water Code section 13267 requires the Regional Water Boards to explain why the requested reports are needed and to identify the evidence supporting their demand. The burden and cost of preparing the reports must also bear a reasonable relationship to the need for the reports and the benefits to be obtained. These requirements matter when an order demands extensive or expensive investigation, particularly when the recipient disputes their connection to the suspected discharge.

Counsel and qualified environmental consultants can compare the requested work with existing reports, available records, and site conditions. If the order requires duplicative work, relies on incomplete information, or calls for access the recipient does not control, identify the problem and support a proposed alternative with relevant facts and technical information. A recipient may have grounds to question the scope of any order, but disputing responsibility does not eliminate the obligation to respond.

Organize the response around actual deadlines

Calendar work plan, field work, report, certification, and other due dates separately. Administrative review or challenge deadlines may also apply. Do not assume that discussions with staff, a pending objection, or a request for an extension suspends the requirements.

If access, laboratory capacity, historical records, or site conditions create a problem, identify it early and seek an appropriate written resolution. A consultant’s schedule does not change an agency deadline by itself.

Preserve drafts, supporting data, source records, and the basis for technical conclusions. Review certifications and statements for accuracy before submission.

Access and costs involving other parties

Sampling may identify soil contamination, groundwater impacts, or off-site migration that warrants additional work. Existing contracts may address cooperation, access, indemnity, or cost sharing without determining the agency’s authority.

Review relevant agency records, historical operations, contracts, and insurance when identifying who may need to cooperate or contribute to costs. Technical reports should distinguish measured results from assumptions and explain what remains unknown.

Questions about section 13267 orders

Does a section 13267 order prove I caused contamination?

Not by itself. The order can require investigation or reports while questions about source, responsibility, and appropriate response remain unresolved. Review its actual findings and authority.

Can I ignore the order while disputing responsibility?

No. Evaluate response and review deadlines promptly. A dispute or informal negotiation does not automatically suspend an enforceable requirement.

Can the technical scope be discussed with the Water Board?

Potentially. A supported proposal may address burden, information needs, access, and alternatives. Any change to a requirement or deadline should be confirmed through the appropriate agency process.

Sources and agency resources

Received a technical report or investigation order?

Review the required work, agency basis, deadlines, and available response options promptly.

Discuss Your Matter