Industrial Stormwater Permit

An industrial stormwater permit authorizes certain stormwater discharges associated with industrial activity and establishes conditions for controlling pollution. In California, many regulated facilities obtain coverage under the Industrial General Permit (IGP) but could also require coverage under other permits. Coverage is the initial step; it does not put the facility in compliance with permit requirements.

Applicability depends on activities and discharges

Permit coverage is not determined solely by a company’s name or the fact that it occupies industrial-zoned land. Evaluate the actual activities, relevant industrial categories, exposure of materials, drainage, and discharge circumstances. The facility’s Standard Industrial Classification will often dictate whether a permit is required.

An exclusion or other alternative may be available only if the facility meets its eligibility and filing requirements. Review the current operation rather than relying on a prior tenant’s coverage or an old consultant’s determination.

What compliance involves after enrollment

The Industrial General Permit requires a stormwater pollution prevention plan (SWPPP) and addresses inspections, pollution controls, monitoring, sampling, training, and reporting. The facility must identify which requirements apply to its operations.

A SWPPP should describe actual operations, potential pollutant sources, drainage, and controls. A document that no longer matches the yard layout, outdoor materials, operations, staffing, or discharge locations can be a problem even when it looks complete on paper.

Reports submitted through SMARTS, the Water Boards’ online reporting system, become part of the facility’s compliance record alongside laboratory reports and inspection logs. Check them against the underlying records before certification; a consultant’s assistance does not remove the signatory’s responsibilities.

An exceedance requires careful interpretation

A numeric action level does not automatically mean a facility has violated its permit. What matters is what the permit requires the facility to do when a result exceeds that level. An exceedance may require further evaluation or corrective action.

For the distinction between a sampling trigger and an effluent limit, see numeric action level exceedances.

Why the public record matters

Monitoring results, inspection reports, annual reports, SWPPPs, and other permit records can become important evidence in Water Board enforcement actions and Clean Water Act citizen suits. The records can help establish what a facility discharged, whether it complied with its permit, and what actions it took in response to problems. If a facility receives an enforcement notice or threat of citizen suit, it should preserve relevant records and carefully compare the allegations with its permit requirements and actual site conditions.

Questions about industrial stormwater permits

Does filing a notice of intent to discharge establish compliance?

No. Enrollment is one part of the process. Once enrolled, the facility must meet the applicable planning, control, monitoring, reporting, and other permit conditions.

Can an indoor operation assume it needs no coverage?

No. Assess the industrial activities, exposure conditions, drainage, and requirements of any claimed exclusion. The conclusion must fit the actual facility.

Sources and agency resources

Need help with industrial stormwater compliance?

Review permit applicability, records, monitoring issues, or an enforcement notice with environmental counsel.

Discuss Your Matter

This information is educational, not legal advice or a legal opinion. Reading it does not create an attorney-client relationship. Requirements and available options depend on the facts and applicable law.

Scroll to Top